ISO 27001: Gap Analysis to Certificate
Thirteen lessons for the people who have to deliver it: the three decisions made before the project starts, a gap analysis worth paying for, writing a risk method and working the first assessment, selecting controls and justifying each one, building evidence as a by-product rather than a project, the first internal audit and a management review that decides something, stage 1 and stage 2 as auditors actually run them, why audit duration is calculated and not negotiated, nonconformity grades and what each costs you, the three-year rhythm afterwards, and how much of the work another framework can reuse.
Used in roles like Security Analyst · SOC Analyst · IT Security Officer · Penetration Tester
What the course covers
-
1. Three decisions made before the project starts
Most ISO 27001 projects that go badly were decided badly in the first fortnight, before anyone had done any work.
-
2. A gap analysis worth paying for
Almost every project opens with a gap analysis. Many are worthless, and the reasons are predictable.
-
3. Writing a risk method you can hand to somebody else
The standard requires a method applied consistently. This lesson writes one. Treat the output as a two-page document, because that is all it needs to be.
-
4. Working the first risk assessment
The first assessment is the one people get wrong by trying to make it perfect. Its job is to exist, to be defensible, and to be improvable.
-
5. Selecting controls, and justifications that hold up
Treatment decisions produce controls. Now they have to be selected, compared against the reference set, and justified individually.
-
6. Building evidence as a by-product, not a project
Every control has to be shown to work. How you arrange that determines whether the system is sustainable or whether every audit is a scramble.
-
7. The document set: minimum viable, and the ones that sink projects
Document sets kill more management systems than auditors do. The standard requires far less writing than is produced in its name, and the surplus has to be maintained forever.
-
8. The internal audit programme, and the first internal audit
Internal audit is a requirement, it is frequently the weakest part of a new system, and it is also the cheapest place to find your own problems before somebody else does.
-
9. A management review that decides something
Management review is where the system either steers or ceremonially notes. The difference is visible in the minutes within a page.
-
10. Stage 1: what the auditor is really checking
Stage 1 is a readiness review of the system's design. It is cheaper than stage 2, shorter, and it exists to tell you what is not ready while there is still time.
-
11. Stage 2: how a certification audit actually runs
Stage 2 tests whether the system works. It is longer, more detailed, and almost entirely about evidence of operation.
-
12. After the certificate: surveillance, change and recertification
The certificate arrives. What follows is the part the project plan rarely covers, and it is where most of a management system's life happens.
-
13. Reusing the work, and the honest limits
Once a management system exists, the obvious question is how much of it serves the next demand — the customer questionnaire, the second framework, the regulation.
Key terms
Decision one: the scope · Decision two: accredited certification, or not · certification body · accredited · Decision three: who owns it, with what authority · And the timeline, which is where optimism does the damage · What it is for · What it should compare you against · and · What the output has to contain · the current state in a sentence · what is missing · what it would take · and who would have to do it · The distinction that saves the most time · Two cautions, both common · How to size the work from it · Part one: what you are assessing
Where this comes from
- ISO/IEC 27001: Information security management systems
- ISO/IEC 27002:2022, Information security controls
- The ISO/IEC 27000 family of standards
- IAF MD 5: Determination of audit time of management systems
- IAF MD 26: Transition requirements for ISO/IEC 27001:2022
- IAF MD 5 update
- Transition requirements for ISO/IEC 27001:2022
- ISO/IEC 27001 transition guide